Usak SPP

Usak SPP

  • Mechanical and Electrical Design Revision
  • Turn-key EPC (Engineering, Procurement and Construction)
  • Contracting Services
  • Mechanical, LV/MV and DC Systems,
  • Test, Commissioning and Acceptance (TEDAS)

    Mechanical Installation: After 30,000 tons of excavation and 10–15 m retaining walls, modules mounted on driven piles. Alignment confirmed by laser survey.
    Electrical Scope: DC cabling in underground trenches, AC armored cabling, MV transformer connection.
    Safety Protocols: Excavation safety (shoring, trench protection), exclusion zones for pile-driving.
    Commissioning: PR tests, IV-curves, SCADA commissioning, TEDAŞ acceptance.
    Standards: IEC 62446, NEC, ISO.

Project Information

4.68 MWp (SPP)
Eşme/UŞAK