Mechanical Installation: PV system installed on flat industrial rooftop using sandwich panel structures with aluminum racking, designed for wind uplift resistance and static load compliance. Electrical Scope: String-level DC cabling, AC integration to facility’s LV distribution panels, SPD and protective earthing systems in line with IEC 60364. Safety Protocols: OSHA-compliant rooftop access, confined-space permits for cabling ducts, electrical PPE enforcement, and ISO 45001 safety procedures. Commissioning: IV-curve validation, inverter setup, SCADA commissioning, and system handover to the client in compliance with Free Zone regulations. Standards: IEC 62446, IEC 60364, NEC, ISO QA standards, Free Zone electrical regulations.