Freetown International Airport SPP
- Mechanical and Electrical Design Revision
- Turn-key EPC (Engineering, Procurement and Construction)
- Contracting Services
- Mechanical, LV/MV and DC Systems,
- Test, Commissioning and Acceptance
Mechanical Installation: PV arrays installed on steel racking structures placed over precast concrete ballast blocks, designed to withstand coastal humidity and corrosion. No excavation or earthworks were performed by Cora Energy; the scope was limited to mechanical installation on ballast foundations.
Electrical Scope: Integration with a 1 MWh DC-coupled battery system, including PCS installation, MV substation cabling, and transformer commissioning. DC/AC cabling and earthing systems executed in compliance with IEC standards.
Safety Protocols: Battery fire suppression measures (per NFPA 855), electrical hazard isolation, PPE enforcement for energy storage handling, and lock-out/tag-out procedures.
Commissioning: Battery BMS communication tests, inverter synchronization, SCADA integration, protection relay coordination, and final plant energization.
Standards: IEC 62933, IEC 62446, IEC 60364, and African utility interconnection codes.