Logo
June 4, 2026 05:18
Ekran Resmi 2025 08 27 11.54.31

Sivrihisar SPP

  • LV/MV Electrical Infrastructure and
  • IP Camera and Site Lighting
  • Design, Procurement, Built, Test,
  • Commissioning and TEDAŞ Acceptance

    Mechanical Installation: Utility-scale PV farm with pile-driven racking, including drainage and grading works.
    Electrical Scope: DC string cabling, AC cabling to MV transformers, grounding system installed.
    Safety Protocols: Excavation safety, electrical lock-out/tag-out, PPE compliance.
    Commissioning: PR verification, SCADA configuration, TEDAŞ acceptance.
    Standards: IEC 60364, IEC 62446, ISO 14001 environmental compliance.

Project Information

5MW Solar Power Plant (SPP)
Sivrihisar/Eskişehir