June 4, 2026 05:20
Yalnizpinar Sereflikochisar1

Yalnızpınar SPP

  • LV/MV Electrical Infrastructure, CCTV and Site Lightin
  • Design, Procurement, Built,
  • Test, Commissioning and TEDAŞ (State Owned Directorate Responsible for Electricity Distribution)
  • Acceptance

    Mechanical Installation: Early large-scale PV reference project with driven pile racking after excavation and drainage.
    Electrical Scope: DC/AC cabling, MV transformer integration, SCADA monitoring.
    Safety Protocols: OSHA-compliant excavation and lifting operations, PPE enforcement.
    Commissioning: System testing, insulation resistance, TEDAŞ acceptance.
    Standards: IEC 62446, NEC.

Project Information

5MW Solar Power Plant (SPP)
Şereflikoçhisar/Yalnızpınar